Anthony Licciardello | November 26, 2026
Cranford, NJ
Union County · Development Update · November 2026 · Cranford, NJ
Cranford has adopted a redevelopment plan for the former EF Britten property at 24 South Avenue West. It allows about 22 homes, five of them affordable, on three-quarters of an acre beside the train tracks. No builder has been named.
Most of the development talk in Cranford this year has been about the larger sites, which we follow in our downtown Cranford progress report. The action this fall was on a small one: a partly demolished industrial property on South Avenue West, beside the rail line. In under six months it went from a study to an adopted plan.
This update covers what the Township Committee approved, what the plan allows, what it leaves open, and why the timing mattered.
The Township Committee adopted the redevelopment plan for 24 South Avenue West on October 6, as Ordinance 2026-25. The ordinance had been introduced at a committee meeting in September.
The steps before that are on the Township's own record. On April 21 the committee passed Resolution 2026-191, asking the Planning Board to study whether the property qualified as an area in need of redevelopment. The study, prepared by the Township's planning consultant, is dated June 1. The Planning Board held its public hearing on July 15 and approved the study that night.
The property is a single parcel, Block 474, Lot 1, of about three-quarters of an acre. It sits on the north side of South Avenue West, between Lincoln Avenue West and South Union Avenue, and it backs onto the NJ Transit right-of-way. It was the EF Britten industrial site, and the buildings have been partly demolished. Tax records cited in the Township's study list the owner as 24 South Ave LLC.
The designation the Township used is a non-condemnation redevelopment area. That term matters. It means the Township cannot use eminent domain here. Any sale of the property has to be voluntary.
The plan permits multifamily or mixed-use development at a density of up to 30 units an acre. On three-quarters of an acre that allows about 22 homes. Five must be affordable, which is 22.7 percent of the total. According to local reporting, the density limit matches the overlay zoning the site already had, and the plan requires adequate parking and buffers between commercial and residential uses.
Figures from the redevelopment plan as reported at introduction and adoption, September and October 2026.
Homes are not the only possible outcome. When the ordinance was introduced, the Township attorney noted that office space is already permitted in the area, so a commercial proposal remains possible.
Several things are not settled. No redeveloper has been named. The Township wrote the land-use rules without tying them to a builder. The published accounts of the plan do not report a height limit or a parking ratio, so read the ordinance itself before assuming either. And any actual building will still need its own application and approval.
An adopted redevelopment plan sets what may be built. It does not approve a project, and it does not mean construction is scheduled. Before anything rises at 24 South Avenue West, an owner or developer has to bring a specific proposal to the Township for review. If you live nearby, that application is the document to watch for.
The plan is part of how Cranford meets its fourth-round affordable housing obligation, the state requirement that covers 2025 through 2035. Local reporting on the adoption described it as the final step in the Township's affordable housing planning, with the plan due to be filed with the court by the end of October.
That deadline explains the pace. A town with a compliant housing plan on file keeps control of its own zoning. A town without one can be sued by a developer seeking to build at a density the town did not choose. By writing the rules for this site itself, the committee set the density, the affordable share and the buffers.
Two positions from the adoption are worth noting, both as reported by Union County Life. Mayor Kathleen Miller Prunty said that no member of the committee supports a payment-in-lieu-of-taxes agreement for the site. And Commissioner Gina Black said she would prefer a project less dense than the maximum the plan allows. For the wider picture, see our Cranford downtown development report.
Twenty-two homes on one lot will not move the Cranford market, but buyers ask about every project near the train. We will show you what homes near downtown are selling for now and how to answer those questions when you sell.
If you own near South Avenue West, get a copy of Ordinance 2026-25 from the Township Clerk and read the height, parking and buffer sections yourself. The news coverage gives the density and the unit count. The details that affect a neighbor are in the ordinance text, and knowing them lets you answer a buyer's questions with facts.
“People hear the word redevelopment and picture something enormous. This one is about twenty-two homes on a lot with a half-demolished factory on it. What I like is that Cranford wrote the rules first and said plainly it does not want a tax break attached. That is a town choosing its own outcome.”
Buyers leaving New York for a downtown they can walk to and a train into the city often find Cranford, and they ask what is being built near the station. The Prodigy Team is licensed on both sides of the bridge, so we work with those buyers before they ever tour a New Jersey home. Our digital reach is built for that pipeline: a YouTube channel with more than 400,000 views over the past year, a relocation community of more than 26,500 members on Facebook, and more than 17 million impressions on Pinterest.
Our in-house aerial series, Above the Streets, shows a home in the context buyers care about: the lot, the block and the town around it.
Call 718-873-7345 or start with a home value review.
The Township Committee adopted a redevelopment plan on October 6, 2026, as Ordinance 2026-25. It permits multifamily or mixed-use development at up to 30 units an acre, or about 22 homes, with five required to be affordable.
At 24 South Avenue West, Block 474, Lot 1. It is about three-quarters of an acre on the north side of South Avenue West between Lincoln Avenue West and South Union Avenue, backing onto the NJ Transit right-of-way.
No redeveloper has been named. The Township set the land-use rules for the site without selecting a builder, and any project will need its own application and approval.
No. The site was designated a non-condemnation redevelopment area, which does not authorize eminent domain. Any acquisition must be voluntary.
Five, which is 22.7 percent of the approximately 22 homes allowed. They count toward Cranford's fourth-round affordable housing obligation.
Sources and data notes. Study request, study date, Planning Board hearing, site description and ownership: Township of Cranford, Area in Need of Redevelopment Study for Block 474, Lot 1, and the Planning Board notice and agenda for July 15, 2026. Introduction of the ordinance, density, unit counts and the Township attorney's remarks: TAPinto Cranford, September 2026. Adoption, ordinance number, plan requirements, court filing deadline and officials' positions: Union County Life, October 13, 2026. Information is deemed reliable but is not guaranteed and should be independently verified.
Prodigy Real Estate is an innovative real estate company offering high-end video production, home valuation services, purchasing, and home sales. Serving New York and New Jersey.